Customer-Driven AI CTI Project Template:Part 2B: Reference Toolkit

Cover image

Article Metadata

Ecosystem Fit

This page mirrors the original Medium article into the 1200km.com Docusaurus ecosystem. The original article flow, images, screenshots, infographics, and technical blocks are preserved from the export.

From pure CTI to hands-on detection engineering with strict validation gates

Article image

This article is one part of a four-part series covering the full customer-driven AI-CTI project lifecycle.

Full Workflow Quick Reference

[Customer-Driven AI CTI Project Full Workflow Quick Reference

Part 1:Foundations and methodology

[Customer-Driven AI CTI Project Template. Part 1: Foundations From pure CTI to hands-on detection engineering with strict validation gates

Covers the foundations: methodology rules, analytic standards, scoring models, governance, roles, and delivery frameworks — thewhatandwhybehind every project decision.

Part 2A :how to do it

[Customer-Driven AI CTI Project Template. Part 2A: Phase-by-Phase Execution Guide From pure CTI to hands-on detection engineering with strict validation gates.

This is the phase-by-phase execution guide — thehow to do it, from project charter and guardrails (Phase 0) through continuous improvement and maturity loop (Phase 14), including project execution controls and the master workflow. Part 1 covers the foundations: methodology rules, analytic standards, scoring models, governance, roles, and delivery frameworks.

Part 2B(this document) is the reference toolkit:

AI Workflow Library, LLM Task Cards, Strict Quality Gates, Master Registers, end-to-end Worked Example, and Final Customer Delivery Package. Read Part 1 first, then use Part 2A as your operational execution guide and Part 2B as your reference during project work.

Table of Contents

  • How to Start Next Monday

  • AI Workflow Library AI Workflow 1: Source Extraction AI Workflow 2: Customer Relevance Mapping AI Workflow 3: Threat Scenario Drafting AI Workflow 4: Hunt Hypothesis Generation AI Workflow 5: Detection Drafting AI Workflow 6: Query Translation AI Workflow 7: Test Case Generation AI Workflow 8: SOC Playbook Drafting AI Workflow 9: Report Drafting AI Workflow 10: Quality Review

  • LLM Task Cards** **Task Card 1: Source Claim Extraction Task Card 2: PIR Quality Challenge Task Card 3: Crown-Jewel Dependency Review Task Card 4: Telemetry Feasibility Review Task Card 5: Threat Scenario Builder Task Card 6: Hunt Hypothesis Generator Task Card 7: Detection Logic Draft Task Card 8: Rule Quality Challenge Task Card 9: SOC Playbook Draft Task Card 10: Executive Report Draft

  • Strict Quality Gates** **Gate A: PIR Approval Gate B: Scenario Approval Gate C: Hunt Approval Gate D: Detection Design Approval Gate E: Production Approval Gate F: Final Delivery Approval

  • Gate Evidence Pack Template

  • Evidence Package Template

  • Master Registers** **Evidence Register Decision Register Source Register PIR Register SIR Register Collection Gap Register Contradiction Register Threat Scenario Register IOC Review Register ATT&CK Mapping Register D3FEND Mapping Register Detection Coverage Gap Register Hunt Backlog Detection Backlog Detection Health Register False-Negative Register Purple-Team Test Register Customer Detection Data Model Register RAID Register Approved AI Tool Register

  • Worked Example: Cloud Identity to Backup Deletion** **Customer Story Step 1: PIR Step 2: SIRs and Collection Tasks Step 3: Source Claim and Evidence Step 3.5: AI Use Log Entries Step 4: Scenario Step 4.5: Gate B — First Attempt Fails Step 5: Observable and Telemetry Step 6: Hunt Hypothesis Step 7: Detection Design Step 8: Test Plan Step 9: SOC Action Step 10: Decision and Metric Step 11: DRL-9 Production Deployment and Gate E Evidence Pack

  • Final Customer Delivery Package

  • Minimum Viable Customer Delivery

  • 30/60/90-Day Execution Plan

  • References

How to Start Next Monday

A new engagement, a blank register, no institutional memory. This checklist gets you to a defensible position by end of week one — using this toolkit exactly as designed.

Before you open any AI tool:

  • Read the project charter or brief. If there is no charter, your first deliverable is the charter. Use the Phase 0 template in Part 2A.

  • Confirm the implementation mode (Mode 1–4 from Part 1 §Implementation Modes). If you cannot answer “does the customer have searchable telemetry and a SIEM?”, you are in Mode 1.

  • Identify your first three decisions the customer needs to make. These become your first three PIRs. Every PIR must name a consumer, a decision, and a time horizon — not a topic area.

  • Check AI governance status. Is there an Approved AI Tool Register entry for the tool you plan to use? If not, AI workflows are disabled until one is approved. Start by completing the AI Tool Approval Checklist (Part 1 §Approved AI Tool Register).

Day 1 — scoping (≈3–4 hours):

  • Open the PIR Register. Write 3–5 PIRs using the Strong PIR Format. Each must name a consumer and a decision.

  • Open the Source Register. List 5–10 sources you plan to use. Assign preliminary source reliability ratings using the two-character combined notation (e.g., B4 = usually reliable source, doubtful claim) defined in Part 1 §Combined Rating Notation.

  • Write the crown-jewel list. Even a rough version: what are the 3–5 things that, if compromised, would constitute a material breach for this customer?

  • Record any known constraints (telemetry gaps, legal/privacy blockers, approval gaps) in the RAID Register.

Day 2 — source intake (≈3 hours):

  • RunAI Workflow 1: Source Extractionon your three highest-priority sources.

  • Complete the Phase 4 pre-screening checklist for each source before submitting to AI.

  • Populate the Evidence Register with extracted claims. Assign evidence labels (Source-reported / Observed / Inferred / Unverified).

  • Flag any IOCs for triage using the IOC Blocking Risk Assessment form.

Day 3 — relevance mapping and first scenario (≈3–4 hours):

  • RunAI Workflow 2: Customer Relevance Mappingagainst extracted claims and crown-jewel list.

  • Draft one threat scenario using the Scenario Template (Part 2A Phase 5). Score it: Business Impact, Likelihood, Risk Score, Detection Feasibility. Use the Worked Example as a calibration reference.

  • Check Gate A exit criteria (Part 2A Phase 1). If you have approved PIRs, a validated source list, and at least one scenario, Gate A is in reach by end of week one.

Day 4 — gap register and customer checkpoint (≈2–3 hours):

  • Populate the Collection Gap Register. For each PIR, ask: “What SIRs do I need? Which data sources would answer each SIR? Do I have them?” Every gap is a row.

  • Open the Contradiction Register. If any two sources make conflicting claims, add a row now.

  • Prepare a 15-minute checkpoint summary for the customer security lead: confirmed PIRs, first scenario priority score, top 3 collection gaps, AI governance status.

Day 5 — Gate A evidence pack:

  • Complete the Gate A Evidence Pack Template using the form in Part 2B §Gate Evidence Pack Template.

  • Required evidence: PIR Register (≥3 approved PIRs), Source Register (≥5 validated sources), first Threat Scenario with a Risk Score, first Decision Register entry.

  • Pass Gate A only if all required evidence is present and no mandatory blocker exists. If you must take a Conditional Pass, name the risk owner and set the 30-day expiry.

What comes next (Week 2 and beyond):

  • Follow the 30/60/90-Day Plan that matches your customer’s maturity level (Minimum Viable or Full Maturity — see §Plan Selection Rules).

  • At each phase milestone, check the Phase-specific Validation Tests in Part 2A and the Gate evidence requirements in Part 2B.

  • Use the PIR Feedback Loop at the end of each cycle (Part 2A Phase 14) to reset requirements for the next.

Common first-week mistakes to avoid:

  • Starting with AI before charter and PIRs are agreed — output will not be traceable to decisions.

  • Using “Phase 4” IOC triage only in Phase 4 — the pre-screening checklist applies to every source at every phase.

  • Writing PIRs as topics (“What do we know about ransomware?”) — PIRs must be decision questions with named consumers.

  • Claiming ATT&CK coverage before a tested detection exists — Coverage Status “Candidate” is not coverage.

AI Workflow Library

This section defines separate AI workflows. Do not use one giant prompt. Each workflow has narrow inputs, outputs, and validation.

AI Workflow 1: Source Extraction

Task:
Extract

claims,

evidence,

IOCs,

TTPs,

actor

labels,

victimology,

dates,

and

confidence

from

one

source.
Inputs:
-

One

source

document.
-

Source

metadata.
Output:
-

Structured

extraction

table.
-

Claims

separated

from

evidence.
-

Proposed

combined

Source

Reliability

/

Information

Credibility

rating

with

rationale

(e.g.,

B4



usually

reliable

actor,

doubtful

claim

based

on

single-source

reporting).
-

Open

questions.
Validation:
-

Analyst

checks

extraction

against

source.
-

Unsupported

claims

removed.
-

Dates

and

actor

labels

verified.
-

If AI-generated or AI-assisted:

verify

whether

the

underlying

evidence

is

traceable.

Unsupported

AI-generated

claims

default

to

F6.

If

traceable

non-AI

sources

exist,

rate

those

separately

and

record

the

AI

step

as

processing

support

per

Part

1

§Rating

AI-Generated

Intelligence.

AI Workflow 2: Customer Relevance Mapping

Task:
Map

validated

CTI

source

content

to

customer

crown

jewels,

technologies,

PIRs,

and

telemetry.
Inputs:
-

Validated

source

extraction.
-

Crown-jewel

register.
-

Telemetry

map.
-

PIR/SIR

register.
Output:
-

Relevance

matrix.
-

Proposed

scenarios.
-

Gaps.
Validation:
-

Customer

owner

confirms

relevance.
-

CTI

lead

confirms

evidence.
-

Platform

owner

confirms

telemetry.

AI Workflow 3: Threat Scenario Drafting

Task:
Draft

a

customer-specific

threat

scenario

from

validated

inputs.
Inputs:
-

PIR.
-

Crown

jewel.
-

Validated

CTI.
-

Telemetry

score.
Output:
-

Scenario

draft.
-

Diamond

Model.
-

Kill

Chain

sequence.
-

ATT&CK

candidates.
-

Collection

gaps.
Validation:
-

Remove

unsupported

actor

claims.
-

Confirm

customer

exposure.
-

Confirm

scenario

has

defensive

action.

AI Workflow 4: Hunt Hypothesis Generation

Task:
Generate

testable

hunt

hypotheses

from

approved

scenarios.
Inputs:
-

Approved

scenario.
-

Available

telemetry.
-

Known

benign

patterns.
Output:
-

Hunt

hypotheses.
-

Expected

observables.
-

Pseudo-queries.
-

Escalation

thresholds.
Validation:
-

Hypothesis

must

be

falsifiable.
-

Required

logs

must

exist.
-

SOC

lead

approves

escalation

threshold.

AI Workflow 5: Detection Drafting

Detection drafting is the highest-complexity AI workflow in this template — it involves schema-specific logic, customer-environment constraints, and detection engineering validation rules that must remain consistent across all analysts and AI tools. Task Card 7 consolidates all of these requirements in one place so that changes to detection logic standards are reflected everywhere without needing to update multiple workflow documents.

This workflow routes to Task Card 7 as the sole canonical work instruction. Do not use this workflow header for inputs, outputs, or validation — follow Task Card 7 exclusively to ensure consistent detection engineering behavior.

Authoritative instruction:

Task Card 7:

Detection

Logic

Draft

AI Workflow 6: Query Translation

Task:
Translate

approved

logic

into

target

SIEM

syntax.
Inputs:
-

Approved

platform-neutral

logic.
-

Target

platform.
-

Customer

schema.
-

Sample

events.
Output:
-

Platform

query.
-

Field

mapping

notes.
-

Known

limitations.
Validation:
-

Query

compiles.
-

Query

runs

against

sample

data.
-

Results

match

expected

behavior.

AI Workflow 7: Test Case Generation

Task:
Generate

positive,

negative,

and

edge

test

cases.
Inputs:
-

Detection

logic.
-

Customer

schema.
-

Known

benign

patterns.
Output:
-

Test

case

table.
-

Synthetic

events

if

allowed.
-

Expected

results.
Validation:
-

Detection

engineer

reviews

realism.
-

Tests

executed.
-

Results

stored.

AI Workflow 8: SOC Playbook Drafting

Task:
Create

analyst

triage

instructions

for

a

validated

detection.
Inputs:
-

Detection

spec.
-

Expected

alert

fields.
-

Customer

escalation

process.
-

False
-positive

notes.
Output:
-

SOC

playbook.
-

Evidence

checklist.
-

Escalation

criteria.
Validation:
-

SOC

analyst

dry-runs

the

playbook.
-

Missing

fields

corrected.
-

Escalation

owner

approves.

AI Workflow 9: Report Drafting

Task:
Draft

executive

and

technical

reports

from

validated

outputs.
Inputs:
-

Approved

findings.
-

Test

results.
-

Metrics.
-

Gaps.
-

Decisions

required.
Output:
-

Executive

summary.
-

Technical

appendix.
-

Decision

list.
Validation:
-

Key

judgments

trace

to

evidence.
-

No

new

claims

introduced.
-

Uncertainty

preserved.

AI Workflow 10: Quality Review

Task:
Challenge

the

final

product

for

unsupported

claims,

missing

tests,

weak

logic,

and

overclaiming.
Inputs:
-

Draft

deliverable.
-

Evidence

register.
-

Test

results.
Output:
-

Issues

list.
-

Required

fixes.
-

Residual

risk.
Validation:
-

Human

reviewer

accepts

or

rejects

each

issue.
-

Fixes

are

tracked.

LLM Task Cards

Use task cards as controlled work instructions. Each task card should be run separately with only the approved inputs for that task.Do not paste the whole project into one prompt.

Task Card 1: Source Claim Extraction

Role:
You

are

a

CTI

extraction

assistant.

You

do

not

assess

beyond

the

provided

source.
Inputs:
-

Source

text

or

source

excerpt.
-

Source

metadata.
Task:
Extract the following into a table:
-

factual

claims;
-

source

assessments;
-

actor

labels;
-

malware

or

tool

names;
-

infrastructure;
-

vulnerabilities;
-

victimology;
-

ATT&CK

candidate

techniques;
-

IOCs;
-

dates

and

activity

windows;
-

confidence

language

used

by

the

source;
-

handling

restrictions;
-

gaps

and

ambiguities.
Rules:
-

Do

not

add

facts

not

present

in

the

source.
-

Use

"not stated"

where

the

source

does

not

provide

information.
-

Quote

only

short

necessary

phrases.
-

Separate

source-observed

evidence

from

source

assessment.
-

If

the

claim

is

AI-generated

or

AI-assisted,

verify

whether

the

underlying

evidence

is

traceable.

Do

not

rate

the

AI

output

itself

as

A

or

B.

Unsupported

AI-generated

claims

default

to

F6.

If

traceable

non-AI

sources

exist,

rate

those

underlying

sources

separately

and

record

the

AI

step

as

processing

support.
Output:
Structured

table

plus

a

short

list

of

analyst

review

questions.

Validation:

  • compare extraction to source;

  • verify dates and actor labels;

  • verify proposed combined rating matches stated rationale;

  • remove unsupported ATT&CK mappings;

  • record accepted/rejected status in AI use log.

Task Card 2: PIR Quality Challenge

Role:
You are a CTI methodology reviewer.
Inputs:
- Draft PIR/SIR register.
- Customer decision list.
Task:
Review
each
PIR
for
decision linkage, scope, collection feasibility,
and
wording quality.
Rules:
- Flag PIRs that are vague, tool-driven, actor-fixated,
or

not
tied
to
a decision.
- Recommend improved wording.
- Identify missing SIRs
and
collection tasks.
-
Do

not
invent customer decisions.
Output:
Issue table
with
severity, rationale,
and
proposed fix.

Validation:

  • CTI lead accepts or rejects each recommendation;

  • customer owner confirms decision language;

  • collection owners confirm feasibility.

Task Card 3: Crown-Jewel Dependency Review

Role:
You are a security architecture review assistant.
Inputs:
- Crown-jewel register.
- Asset
and
dependency notes.
- Identity, cloud, network,
and
backup notes.
Task:
Identify missing dependencies, privileged access paths, third-party paths,
and
recovery dependencies.
Rules:
- Distinguish observed dependencies
from
questions
to
ask.
-
Do

not
classify an asset
as
crown jewel unless already listed.
- Produce owner-facing questions
for
missing context.
Output:
Dependency gap table
and
interview question list.

Validation:

  • system owner confirms dependency;

  • platform owner confirms access path;

  • recovery owner confirms backup dependency.

Task Card 4: Telemetry Feasibility Review

Role:
You are a detection data-source reviewer.
Inputs:
- Proposed detection
or
hunt.
- Telemetry map.
- Sample
event
fields.
Task:
Determine whether the detection
or
hunt
is
feasible
with
current telemetry.
Rules:
- Check required log sources, fields, retention, parsing,
and
joins.
- Mark
each
requirement
as
available,
partial
, missing,
or
unknown.
-
Do

not
assume a field exists because a platform usually has it.
Output:
Feasibility matrix, blocking gaps,
and
workaround options.

Validation:

  • sample events inspected;

  • query run by analyst;

  • platform owner confirms retention and parsing.

Task Card 5: Threat Scenario Builder

Role:
You

are

a

CTI

scenario

drafting

assistant.
Inputs:
-

Approved

PIR.
-

Approved

crown

jewel.
-

Validated

CTI

source

extracts.
-

Telemetry

score.
Task:
Draft

one

customer-specific

threat

scenario.
Rules:
-

Use

only

provided

evidence.
-

Separate

reported

facts,

source

assessments,

and

project-team

inferences.
-

Include

Diamond

Model,

Kill

Chain

sequence,

ATT&CK

candidates,

telemetry

requirements,

detection

opportunities,

and

gaps.
-

Do

not

assign

actor

attribution

unless

evidence

supports

it.
Output:
Threat

scenario

draft

in

the

project

scenario

template.

Validation:

  • CTI lead validates evidence;

  • customer owner validates relevance;

  • detection engineer validates feasibility;

  • unsupported actor claims removed.

Task Card 6: Hunt Hypothesis Generator

Role:
You are a threat hunting design assistant.
Inputs:
- Approved threat scenario.
- Telemetry map.
- Known benign patterns.
Task:
Generate three
to
five testable hunt hypotheses.
Rules:
-
Each
hypothesis must be falsifiable.
-
Each
hypothesis must define expected observables.
-
Each
hypothesis must list required data sources
and
fields.
- Include benign explanations
and
escalation thresholds.
Output:
Hunt hypothesis table.

Validation:

  • hunter confirms query feasibility;

  • SOC lead confirms escalation threshold;

  • benign pattern owner reviews false positives.

Task Card 7: Detection Logic Draft

Role:
You

are

a

detection

engineering

assistant.
Inputs:
-

Approved

detection

design.
-

Customer

schema

(from

Customer

Detection

Data

Model

Register).
-

Sample

events

(with

timestamps

from

Customer

Detection

Data

Model

Register).
-

Known

false

positives.
Pre-run

Schema

Freshness

Check

(mandatory

before

drafting):
1
.

Locate

the

sample-event

timestamp(s)

in

the

Customer

Detection

Data

Model

Register

for

each

required

data

source.
2
.

Calculate

the

number

of

days

between

the

sample-event

timestamp

and

today's

date.
3. If any required data source has a sample-event timestamp older than 30 days:

OUTPUT THE FOLLOWING WARNING before producing any detection logic:



SCHEMA

FRESHNESS

WARNING



LOGIC

PARITY

UNCERTAIN

Data source:
[
source

name
]

Sample event timestamp:
[
date
]

Age:
[
N
]
days

(exceeds

30
-day

freshness

threshold)

Risk:

The

schema,

field

names,

field

types,

or

event

structure

may

have

changed

since

the

sample

was

collected.

Detection

logic

drafted

against

stale

schema

may

produce

syntax

errors,

missing-field

failures,

or

incorrect

logic

in

the

current

environment.

Required action:

The

detection

engineer

must

either

(a)

collect

a

fresh

sample

event

from

the

production

environment

and

update

the

Customer

Detection

Data

Model

Register

before

proceeding,

or

(b)

explicitly

accept

the

schema

freshness

risk

in

writing,

document

the

acceptance

in

the

AI

Use

Log,

and

add

a

Detection

Health

Register

note

flagging

the

schema

validation

dependency.

Do

not

proceed

with

detection

logic

drafting

until

the

detection

engineer

responds

to

this

warning.
4
.

If

all

sample-event

timestamps

are



30 days old:

proceed

with

detection

logic

drafting

without

the

warning.
Task:
Draft

platform-neutral

detection

logic

and

one

target-platform

implementation.
Execute

only

after

the

Schema

Freshness

Check

is

complete

and

any

warnings

are

resolved.
Rules:
-

Use

only

fields

shown

in

the

schema

or

sample

events.
-

Include

required

joins

and

time

windows.
-

Include

suppression

and

tuning

notes

separately

from

core

logic.
-

Include

positive,

negative,

and

edge

test

cases.
-

Include

the

schema

freshness

check

result

in

the

output

header.
Output:
Schema

freshness

check

result,

detection

spec,

query

draft,

and

test

plan.
Validation:
schema

freshness

check

completed

and

result

recorded;
if schema freshness warning was issued:

detection

engineer

resolution

documented

in

AI

Use

Log

before

logic

was

drafted;
query

syntax

test

passes;
positive

test

passes;
negative

test

passes;
historical

preview

completed;
detection

engineer

approves.

Task Card 8: Rule Quality Challenge

Role:
You are a skeptical detection reviewer.
Inputs:
- Detection rule.
- Detection design.
- Test results.
-
False
-positive notes.
Task:
Find weaknesses
in
the detection.
Rules:
- Check whether the rule detects the intended behavior.
- Identify missing fields, logic gaps, bypass paths, overbroad conditions,
and
tuning risks.
- Identify tests that are missing.
-
Do

not
rewrite the rule unless asked.
Output:
Findings ordered
by
severity
with
recommended fixes.

Validation:

  • detection engineer triages each finding;

  • accepted fixes are implemented;

  • rejected findings include rationale.

Task Card 9: SOC Playbook Draft

Role:
You

are

a

SOC

workflow

assistant.
Inputs:
-

Approved

detection.
-

Alert

fields.
-

Customer

escalation

process.
-

Known

false

positives.
Task:
Draft

a

SOC

triage

playbook.
Rules:
-

Write

steps

that

an

L1/L2

analyst

can

execute.
-

Include

first

15
-minute

triage,

enrichment,

benign

explanations,

escalation,

containment

criteria,

evidence

preservation,

and

closure

categories.
-

Do

not

recommend

containment

unless

criteria

are

met.
Output:
SOC

playbook

draft.

Validation:

  • SOC analyst dry-runs playbook;

  • missing fields corrected;

  • escalation owner approves.

Task Card 10: Executive Report Draft

Role:
You are an executive CTI reporting assistant.
Inputs:
- Approved
key
judgments.
- Detection
and
hunt outcomes.
- Metrics.
- Remaining risks.
- Decisions required.
Task:
Draft an executive report.
Rules:
- Use decision language.
-
Preserve
confidence
and
uncertainty.
-
Do

not
introduce
new
findings.
- Separate completed actions
from
recommended decisions.
- Avoid technical detail unless it supports a decision.
Output:
Executive report draft
with

key
judgments, outcomes, risks,
and
required decisions.

Validation:

  • every key judgment traces to evidence;

  • CTI lead approves confidence language;

  • customer security lead approves business framing.

Task Card 11: Final Red-Team Review of the Deliverable

Role:
You are a hostile quality reviewer
for
a CTI
and
detection engineering deliverable.
Inputs:
- Final draft.
- Evidence register.
- Test evidence.
- AI use log.
Task:
Identify
where
the deliverable overclaims, hides uncertainty, lacks evidence, lacks tests, misuses AI,
or
fails
to
support a customer decision.
Rules:
- Produce findings,
not
rewrites.
- Tie
each
finding
to
a section.
- Assign severity.
- Recommend concrete fix.
Output:
Quality findings table
and
final go/no-go recommendation.

Validation:

  • quality reviewer confirms findings;

  • project lead resolves mandatory findings;

  • residual risks are documented.

Strict Quality Gates

Gate status values:

Pass
/
Conditional

Pass
/
Fail

Conditional pass rules:

  • conditional pass requires named risk owner approval;

  • exception must have expiry date;

  • maximum exception duration is 30 days unless executive sponsor approves longer;

  • mandatory blockers cannot receive conditional pass unless the risk is explicitly accepted;

  • expired exceptions revert gate status to Fail.

Gate A: PIR Approval

Pass only if:

  • every PIR supports a named decision;

  • every SIR has collection tasks;

  • customer owners approve.

  • **Gate owner:**CTI lead and customer security lead

  • **Required evidence:**PIR Register, Decision Register, Collection Gap Register

  • **Mandatory blockers:**No decision owner, no SIRs, no collection path

  • **Conditional pass allowed?:**Yes, if missing owner or collection task has a dated remediation

  • **Non-waivable blockers (Conditional Pass not permitted under any circumstances):**No named decision owner for any approved PIR; no SIRs derived from any approved PIR; no collection plan for any open SIR

  • **Waivable blockers (Conditional Pass permitted with dated remediation plan and named risk owner):**Individual collection task not yet assigned; source not yet validated for a specific SIR; crown-jewel list pending final business owner approval within 5 business days

  • **Conditional pass allowed?:**Yes — only for waivable blockers listed above. Non-waivable blockers must be resolved before Gate A can be passed under any circumstances.

  • **Exception expiry:**Maximum 30 days

Gate B: Scenario Approval

Pass only if:

  • scenario maps to crown jewels;

  • evidence is cited;

  • telemetry feasibility is known;

  • alternatives and gaps are documented;

  • any scenario with Risk Score ≥ 20 and Detection Feasibility < 3 has a documented telemetry remediation plan, control recommendation, or architecture decision.

  • **Gate owner:**CTI lead and customer security lead

  • **Required evidence:**Scenario Register, Evidence IDs, priority score, telemetry score

  • **Mandatory blockers:**No crown-jewel mapping, no Evidence ID, unsupported attribution, Risk Score ≥ 20 with Detection Feasibility < 3 and no telemetry remediation plan, control recommendation, or architecture decision

  • **Conditional pass allowed?:**Yes, for telemetry gaps if scenario is labeled high risk but not detectable, provided a remediation plan owner and due date are assigned

  • **Non-waivable blockers (Conditional Pass not permitted):**No crown-jewel mapping; no Evidence ID; unsupported attribution claim (e.g., actor attribution with no source-reported or observed evidence)

  • **Waivable blockers (Conditional Pass permitted with remediation plan, owner, and due date):**Risk Score ≥ 20 with Detection Feasibility < 3 — waivable only if a telemetry remediation plan, control recommendation, or architecture decision is documented with a named owner and target date

  • **Conditional pass allowed?:**Yes — only for waivable blockers above. Non-waivable blockers must be resolved. A scenario with no crown-jewel mapping or no Evidence ID cannot pass Gate B under any circumstances.

  • **Exception expiry:**Maximum 30 days

Gate C: Hunt Approval

Pass only if:

  • hypothesis is falsifiable;

  • logs exist;

  • expected observables are defined;

  • escalation threshold is clear.

  • **Gate owner:**CTI lead and SOC lead

  • **Required evidence:**Hunt hypothesis, telemetry map, expected observables, result classification

  • **Mandatory blockers:**No observable, no data source, no result classification

  • **Non-waivable blockers for execution (hunt cannot be executed):**No observable defined; no confirmed data source; no result classification schema (how will the hunter know if they found something?); no escalation threshold

  • **Non-waivable blockers for backlog inclusion:**No parent PIR or Scenario ID

  • **Conditional pass allowed?:**No for execution; yes for backlog only

  • **Exception expiry:**Not applicable for execution

Gate D: Detection Design Approval

Pass only if:

  • logic maps to behavior;

  • fields exist;

  • false positives are understood;

  • test plan exists.

  • **Gate owner:**Detection engineer

  • **Required evidence:**Detection design, field mapping, ATT&CK mapping, D3FEND mapping, test plan

  • **Mandatory blockers:**Missing fields, no test plan, no owner, unsupported ATT&CK mapping counted as coverage

  • **Non-waivable blockers (cannot proceed even in lab):**No named detection owner; no Scenario ID link; required fields not confirmed in customer schema; ATT&CK mapping status “Candidate” counted toward Coverage Status “Covered”

  • **Waivable blockers (lab work may continue with dated remediation plan):**D3FEND mapping not yet completed; test plan drafted but test data not yet available; ATT&CK mapping status “Candidate” — acceptable for lab as long as it is not counted as coverage

  • **Conditional pass allowed?:**Yes for lab work only, not pilot

  • **Exception expiry:**Maximum 30 days

Gate E: Production Approval

Pass only if:

  • syntax test passed;

  • positive test passed;

  • negative test passed;

  • historical preview completed;

  • SOC playbook approved;

  • owner and review date assigned.

  • **Gate owner:**Detection engineer and SOC lead

  • **Required evidence:**Test Evidence ID, SOC Playbook ID, Detection Health entry, rollback plan, labeling completeness record from pilot

  • **Mandatory blockers:**Missing rollback, no negative test, unvalidated synthetic event, no owner, no SOC path, no monitoring, pilot alert labeling completeness below 80% without pilot extension or relabeling, emergency disable procedure not confirmed

  • **Conditional pass allowed?:**Yes, only with risk owner approval

  • **Non-waivable blockers (cannot proceed even in lab):**No named detection owner; no Scenario ID link; required fields not confirmed in customer schema; ATT&CK mapping status “Candidate” counted toward Coverage Status “Covered”

  • **Waivable blockers (lab work may continue with dated remediation plan):**D3FEND mapping not yet completed; test plan drafted but test data not yet available; ATT&CK mapping status “Candidate” — acceptable for lab as long as it is not counted as coverage

  • **Conditional pass allowed?:**Yes for lab work only; a detection with a non-waivable blocker cannot advance to pilot. No pilot may be authorized without all non-waivable blockers resolved and a full test plan in place.

  • **Exception expiry:**Maximum 30 days

  • **Final status:**Pass / Conditional Pass / Fail

Gate F: Final Delivery Approval

Pass only if:

  • key judgments trace to evidence;

  • deployed detections have test evidence;

  • gaps are visible;

  • outcomes are measurable: each Phase 0 success metric has a recorded final value, and each metric either meets its defined floor (named scenario at minimum DRL; named telemetry gap closed; hunt count and classification met) or has a documented exception with a named risk owner;

  • AI use is logged.

  • **Gate owner:**CTI lead and customer security lead

  • **Required evidence:**Final package, Evidence Register, Decision Register, Detection Health Register, AI Use Log, Customer Acceptance Record

  • **Mandatory blockers:**Unsupported key judgment, missing customer acceptance, unlogged AI use, unresolved production-affecting contradiction, candidate ATT&CK mapping counted as coverage, production claim below DRL-9, any ATT&CK technique in the ATT&CK Mapping Register that is linked to a scenario with Risk Score ≥ 20 or Engineering Priority EP1 and has Coverage Status “Gap” with no documented infeasibility reason in the Detection Coverage Gap Register

  • **Conditional pass allowed?:**Yes, with documented exceptions and risk owner approval

  • **Non-waivable blockers (delivery cannot be authorized under any circumstances):**Any key judgment with no traceable evidence and no documented assumption; missing signed Customer Acceptance Record; any AI output used in a deliverable with no AI Use Log entry; unresolved production-affecting contradiction (per the Contradiction Register definition); any ATT&CK technique claimed as “Covered” without DRL-7 or above; any production coverage claim for a detection below DRL-9; Task Card 11 not executed against the final draft

  • **Waivable blockers (Conditional Pass with documented exception, risk owner, and expiry date):**ATT&CK technique in a scenario with Risk Score ≥ 20 with Coverage Status “Gap” — waivable only if the Detection Coverage Gap Register row has an infeasibility reason, an owner, and a dated remediation target; Task Card 11 Critical/High finding — waivable only with a named risk owner and a documented resolution plan; a Phase 0 success metric not meeting its defined floor — waivable only with a named risk owner and a dated remediation commit

  • **Conditional pass allowed?:**Yes — only for waivable blockers above. Non-waivable blockers cannot be conditionally waived under any circumstances: missing customer acceptance, unlogged AI use, unsupported key judgment, and production-affecting contradictions have no exception path.

  • **Exception expiry:**Maximum 30 days

Gate Evidence Pack Template

Gate ID:
Gate name:
Gate owner:
Date:
Related deliverables:
Required evidence:
Evidence IDs:
Test Evidence IDs:
Decision IDs:
Open blockers:
Exception requested:
Risk owner:
Exception expiry:
Gate status:
Approver:
Notes:

Evidence Package Template

Use evidence packages for customer acceptance, audits, and final signoff.

Package ID:
Related Deliverable:
Evidence IDs:
Source IDs:
Decision IDs:
Screenshots / Query Outputs:
Sample Events:
Test Results:
Reviewer:
Open Gaps:
Contradictions:
Accepted Limitations:
Approval:

Master Registers

Evidence Register

|
Evidence

ID
|
Claim
|
Evidence

Label
|
Source

ID
|
Reliability
|
Credibility
|
Task

Card

ID
|
AI

Session

ID
|
Status
|
Notes
|
|
-------------
|
-------
|
----------------
|
-----------
|
-------------
|
-------------
|
--------------
|
---------------
|
--------
|
-------
|
|
E-001
| | | | | | | | | |

Evidence Label options: Source-reported / Observed / Analyst inference / Unverified

Evidence status values:

Accepted
/
Rejected
/
Superseded
/
Needs

Corroboration
/
Contradicted
/
Expired

Decision Register

|
Decision ID
|
Decision
|

Date

|
Owner
|
Evidence IDs
|
Related PIR
|
Success Metric
|
Status
|
Review
Date

|
|
-------------|----------|------|-------|--------------|-------------|----------------|--------|-------------|
|

DEC
-001

|

|

|

|

|

|

|

Open

|

|

Decision status values:

Open

/
Pending Evidence
/
Recommended
/
Approved
/
Rejected
/
Deferred
/
Superseded

Source Register

|
Source ID
|
Title
|

Date

|
Type
|
Reliability
|
Credibility
|
Combined Rating
|
Rating Rationale
|
Relevance
to
PIRs
|
Handling
|
Notes
|
|
-----------|-------|------|------|-------------|-------------|-----------------|------------------|-------------------|----------|-------|
|
SRC
-001

|

|

|

|

|

|

|

|

Type: Vendor report / Government advisory / OSINT / Customer-observed / ISAC / Internal

Combined Rating:[Source Reliability letter][Information Credibility number] — e.g., B4. For AI-assisted entries, rate the underlying traceable source separately. Unsupported AI-generated claims default to F6. IC 1 is not assigned to the AI output itself; the underlying claim may only be treated as confirmed when independently verified through human-verifiable, non-AI evidence. See Part 1 §Combined Rating Notation and §Rating AI-Generated Intelligence.

PIR Register

|
PIR ID
|
Decision Supported
|
Question
|
Consumer
|

Time
Horizon
|
Required Confidence
|
Likely Action if Answered
|
Crown Jewels
|
Status
|
|
--------|--------------------|----------|----------|--------------|---------------------|---------------------------|--------------|--------|
|
PIR
-01

|

|

|

|

|

|

|

|

Open

|

SIR Register

|
SIR ID
|
Parent PIR
|
Question
|
Collection Approach
|
Required Evidence Type
|
Data Source
|
Confidence Threshold
|
Owner
|
Due
Date

|
Closure
Condition

|
Status
|
|
-----------|------------|----------|---------------------|------------------------|-------------|----------------------|-------|----------|-------------------|--------|
|
SIR
-01.1

|

|

|

|

|

|

|

|

|

|

Open

|

Collection Gap Register

|
Gap ID
|
SIR ID
|
Data Source
|
Gap Description
|
Owner
|
Remediation Plan
|
Due
Date

|
Status
|
|
---------|--------|-------------|-----------------|-------|------------------|----------|--------|
|
GAP
-001

|

|

|

|

|

|

|

Open

|

Status: Open / Accepted / Closed

Contradiction Register

|
Contradiction

ID
|
Claim

A
|
Source

A
|
Claim

B
|
Source

B
|
Production

Affecting
|
Detection

IDs
|
Entry

Date
|
Review

Date
|
Status
|
Resolution
|
|
------------------
|
---------
|
----------
|
---------
|
----------
|
----------------------
|
---------------
|
------------
|
-------------
|
--------
|
------------
|
|
CON-001
| | | | |
No
| | | |
Open
| |

Status: Open / Resolved / Accepted / Overdue

**Production-affecting lookup rule:**A contradiction is production-affecting if it involves a claim that directly drives the severity, priority, ATT&CK mapping, or suppression logic of any active or pilot detection. Analyst judgment is not sufficient to mark a contradiction as not production-affecting when the conflict involves actor attribution, victim scope, or infrastructure overlap with a detection in production or pilot.

**Default review date rule:**When a contradiction is first entered, set the initial review date to 7 calendar days from the entry date. If the contradiction is not resolved or re-assessed within 7 days, it must appear in the next weekly register hygiene review as overdue.

Threat Scenario Register

|
Scenario

ID
|
Name
|
Decision

ID
|
Actor

Class
|
Crown

Jewels
|
Impact
|
Business

Impact
|
Likelihood
|
Risk

Score
|
Def
.
Relevance
|
Det
.
Feasibility
|
Eng
.
Priority
|
Priority

Label
|
Confidence
|
Status
|
|
-------------
|
------
|
-------------
|
-------------
|
--------------
|
--------
|
-----------------
|
------------
|
------------
|
----------------
|
------------------
|
---------------
|
----------------
|
------------
|
--------
|
|
SCN-01
| | | | | | | | | | | | | |
Draft
|

IOC Review Register

|
IOC ID
|
IOC
Value

|
Type
|
Source ID
|
Source
Date

|
Evidence ID
|
Confidence
|
Action
|
Owner
|
Review
Date

|
Notes
|
|
---------|-----------|------|-----------|-------------|-------------|------------|--------|-------|-------------|-------|
|
IOC
-001

|

|

|

|

|

|

|

|

|

|

|

Type: IP / Domain / Hash / URL / Email / Certificate / ASN / Other

IOC actions:

Observe / Enrich / Hunt / Detect / Block / Do
not

use
/ Expired

ATT&CK Mapping Register

| Mapping ID | Technique ID | Technique Name | Scenario ID | Detection ID | DRL | Coverage Status | Notes |
|
------------|--------------|----------------|-------------|--------------|-----|-----------------|-------|
| MAP
-001
| | | | | | Candidate | |

Coverage Status: Covered / Partial / Telemetry Only / Gap / Candidate

D3FEND Mapping Register

| D3FEND ID | D3FEND Technique | Category | ATT&CK Technique ID | ATT&CK Mapping ID | Implementation Status | Evidence ID | Owner | Notes |
|
------------|--------------------------|----------|---------------------|-------------------|-----------------------|-------------|-------|-------|
| D3F
-001
| | | | | Not Implemented | | | |

Category: Harden / Detect / Isolate / Deceive / Evict

Implementation Status: Implemented / Planned / Not Implemented / Infeasible

**Populate rules:**Every row must reference a specific D3FEND technique (e.g., D3-UAP: User Account Permissions), not a category. Link each row to an ATT&CK Mapping Register ID. Set Implementation Status to “Implemented” only when an active defensive capability exists and is linked to an Evidence ID. “Planned” entries require a named owner and a target date in the Notes field. “Infeasible” entries require a rationale. Rows linked to Candidate ATT&CK mappings must be updated or removed when the mapping is resolved.

Quality rules for this register are in Part 1 → D3FEND Countermeasure Mapping.

Detection Coverage Gap Register

The Detection Coverage Gap Register is a derived view — it does not require a separate source of truth. It is generated by cross-referencing the Threat Scenario Register and the ATT&CK Mapping Register to identify which ATT&CK techniques associated with approved threat scenarios have no coverage at DRL-7 or above.

|
Gap ID
|
Technique ID
|
Technique Name
|
Scenario ID
|
Risk Score
|
Eng. Priority
|
Coverage Status
|
Gap Reason
|
Infeasibility Reason
|
Owner
|

Last
Reconciled
|
|
-----------|--------------|----------------|-------------|------------|---------------|-----------------|------------|----------------------|-------|-----------------|
|
DCGAP
-001

|

|

|

|

|

|
Gap
|

|

|

|

|

Coverage Status: Gap / Partial / Telemetry Only

**How to populate:**For each ATT&CK technique referenced in an approved threat scenario, check the ATT&CK Mapping Register for a linked Detection ID with DRL ≥ 7. If none exists, add a row. Gap Reason should name the obstacle (no telemetry, no rule design, backlog not started, or known infeasibility). Owner is the detection engineer or CTI lead responsible for closing or formally accepting the gap.

The Detection Coverage Gap Register must be included in the Final Customer Delivery Package and reviewed at every executive checkpoint. A row in this register is Gate F relevant — and blocks Gate F — if the linked scenario has Risk Score ≥ 20 or Engineering Priority EP1 and Coverage Status is “Gap” with no documented infeasibility reason. Coverage Status “Partial” or “Telemetry Only” does not trigger the Gate F blocker.

**Derivation trigger:**The Detection Coverage Gap Register must be regenerated or manually reconciled whenever any detection changes DRL, any threat scenario is approved or modified, or any ATT&CK mapping changes Coverage Status. The accountable owner must record the date of the last reconciliation in the register or in the weekly register hygiene record.

Hunt Backlog

|
Hunt ID
|
Hypothesis
|
Scenario ID
|
Required Telemetry
|
Expected Observables
|
Escalation Threshold
|
Status
|

Result

|

Result
Classification
|
Hunter
|
Completed
|
Notes
|
|
---------|------------|-------------|--------------------|----------------------|----------------------|--------|--------|-----------------------|--------|-----------|-------|
|
HUNT
-01

|

|

|

|

|

|
Queued
|

|

|

|

|

|

Status: Queued / In Progress / Completed / Cancelled

The Hunt Backlog serves as both the planning queue and the hunt results register. When a hunt is executed, the Result and Result Classification fields must be populated before the hunt is closed. A hunt with status “Completed” and empty Result or Result Classification fields is not a valid closed hunt for delivery or metrics purposes. There is no separate Hunt Results Register; the Hunt Backlog is the authoritative artifact for hunt outcomes in the Final Customer Delivery Package and executive reports.

Detection Backlog

| Detection ID | Name | Scenario ID | ATT&CK Techniques | Log Sources | Required Fields | DRL | Status | Owner | Priority | Notes |
|
--------------|------|-------------|-------------------|-------------|-----------------|-------|--------|-------|----------|-------|
| DET
-001
| | | | | | DRL
-0
| Idea | | | |

Status: Idea / Design / Lab / Candidate / Pilot / Production / Deferred / Rejected

The Detection Backlog is the planning and engineering queue. It tracks ideas, lab rules, designs, and candidates that may never become operational.

Detection Health Register

|
Detection ID
|
Status
|
DRL
|
Alert Volume
|
Labeling Completeness (
%
)
|
FP Rate
|
TP Count
|
Benign TP Count
|

Last
Fired
|

Last
Tested
|

Last
Reviewed
|
Data Source Health
|
Rule Errors
|
Suppression Hit Rate
|

Last
Disable Test
|
Next Disable Test
|
Owner
|
Action Required
|
|
--------------|--------|-----|--------------|---------------------------|---------|----------|-----------------|------------|-------------|---------------|--------------------|-------------|----------------------|-------------------|-------------------|-------|-----------------|
|
DET
-001

|

|

|

|

|

|

|

|

|

|

|

|

|

|

|

|

|

|

The Detection Health Register tracks the operational state of pilot and production detections.

Labeling completenessis the percentage of alerts in a given period that have been classified by the SOC as true positive, benign true positive, false positive, duplicate, or insufficient evidence. Precision estimates are only valid when labeling completeness is at least 80%.

Labeling completeness historymust be tracked as a monthly average. The Detection Health Register must retain at least the last three monthly labeling completeness values. The 90-day zero true-positive demotion trigger requires that labeling completeness was at or above 80% for each of the three preceding monthly review periods, not only the current point-in-time figure. If fewer than three monthly periods are available, document available periods and note the limitation. Monthly average is calculated over each calendar month for which at least five alerts were generated. If fewer than five alerts were generated in a calendar month, record the actual count, note the limitation, and do not use that month’s figure as a valid completeness measurement for the demotion trigger.

Last disable test dateandnext disable test duetrack whether the emergency disable procedure has been exercised. Every production detection must have a confirmed disable test within 12 months of production deployment. Detection with no recorded test date is not eligible for DRL-9.

Metric definitions:

Precision
=
True
Positives / (
True
Positives +
False
Positives)

Precision is only meaningful when labeling completeness is at least 80%. Precision is undefined (not zero) when TP count is zero; report as “no malicious TP in measurement period — precision undefined” rather than 0%. Reporting 0% implies the formula was applied with at least one true positive, which misstates the detection’s operational state and may trigger unwarranted tuning pressure on a correctly-functioning detection.

Known false negatives may come from purple-team tests, confirmed incidents, missed historical cases, or manual hunt findings.

False-Negative Register

|
FN ID
|
Detection ID
|
ATT
&
CK Technique ID
|
Incident
/
Test Reference
|
Evidence ID
|

Date
Discovered
|
Root Cause
|
Root Cause Category
|
Resolution Action
|
Resolved
Date

|
Owner
|
|
---------|--------------|---------------------|---------------------------|-------------|-----------------|------------|---------------------|-------------------|---------------|-------|
|
FN
-001

|

|

|

|

|

|

|

|

|

|

|

Root Cause Category: Logic gap / Missing telemetry / Field parsing error / Threshold misconfiguration / Scope exclusion / Unknown

**Populate rules:**Add an entry for every confirmed missed detection: adversary action confirmed by hunt, IR, red-team, or purple-team test where a production or pilot detection should have fired and did not. Each entry must link to a Detection ID, an ATT&CK technique, and an Evidence ID or incident reference. Root Cause must be assessed within 5 business days of discovery. Resolution Action must be documented within 10 business days. Unresolved entries older than 30 days block DRL-9 promotion for the linked detection. Two or more entries for the same detection within any 90-day window trigger mandatory demotion to DRL-7 pending logic review. Entries are permanent — do not delete resolved rows; set Resolved Date and keep the record.

Quality rules and demotion triggers for this register are in Part 1 → False-Negative Register.

Purple-Team Test Register

|
PT ID
|
Detection ID
|
ATT
&
CK Technique
|
Execution
Method

|
Tool Used
|
Test Environment
|
Test
Date

|
Detection Fired
|

False
Negative
|

Result

|
Reviewer
|
Notes
|
|
--------|--------------|------------------|------------------|-----------|------------------|-----------|-----------------|----------------|--------|----------|-------|
|
PT
-001

|

|

|

|

|

|

|

|

|

|

|

|

Execution Method: manual / automated emulation / attack simulation tool

Test Environment: isolated lab / staging / production-isolated

Result: pass / conditional pass / fail — tuning gap / fail — false negative / deferred

**Populate rules:**Add an entry for every purple-team test executed. Mandatory for detections mapped to a scenario with Risk Score ≥ 20 before DRL-9 promotion, and for Tier 1 crown-jewel attack paths regardless of Risk Score. A “fail — false negative” result requires a linked False-Negative Register entry and DRL demotion to DRL-5. A “deferred” result requires a RAID Register entry with an approved alternative evidence approach and a dated resolution target before DRL-9 promotion is eligible. This register is included in the Gate E evidence pack and the Final Customer Delivery Package.

Purple-team test methodology and result classifications are in Part 2A → Phase 9 → Purple-Team Test Requirements.

Customer Detection Data Model Register

|
Source ID
|
Data Source
|
Log
Type

|
Field Name
(
Canonical
)

|
Customer Field Name
|
Data
Type

|
Sample Value
|
Parsing Status
|
Notes
|
|
-----------
|
-------------
|
----------
|
------------------------
|
---------------------
|
-----------
|
--------------
|
----------------
|
-------
|
|
DS-
001

|

|

|

|

|

|

|

|

|

Parsing Status: Parsed / Partial / Not parsed / Unknown

RAID Register

|
RAID ID
|
Type
|
Description
|
Impact
|
Probability
|
Owner
|
Status
|
Mitigation
/
Response
|
Due
Date

|
|
----------|------|-------------|--------|-------------|-------|--------|-----------------------|----------|
|
RAID
-001

|
Risk
|

|

|

|

|

Open

|

|

|

RAID types:

Risk
/
Assumption
/
Issue
/
Dependency

Customer Acceptance Record

|
Acceptance ID
|
Deliverable
/
Milestone
|
Accepted
By

|
Role
|

Date

|
Conditions
|
Status
|
|
---------------|-------------------------|-------------|------|------|------------|---------|
|
ACC
-001

|

|

|

|

|

|
Pending
|

Status: Accepted / Accepted with Conditions / Rejected / Pending

AI Use Log

|

Date

|
Workflow
/
Task Card
|
Inputs
|
Output
|
Model
/
Tool
|
Reviewer
|
Reviewed
By

|
Quality Checklist ID
|
Validation Summary
|
Status
|
|
------|----------------------|--------|--------|--------------|----------|-------------|----------------------|--------------------|--------|
|

|

|

|

|

|

|

|

|

|

|

Status: Accepted / Rejected / Revised

**Quality Checklist column definition:**This column contains a reference ID to the completed seven-item AI Quality Tests checklist stored as a separate artifact for this AI use log entry. The checklist artifact must record pass or fail for each of the seven tests: source grounding, no fabrication, customer fit, uncertainty preserved, actionability, security review, and prompt-injection resistance. If any test fails, the Status column must be “Rejected” or “Revised” and the reason must be documented. An entry without a Quality Checklist reference ID is not considered reviewed and must not be used in any deliverable.

Approved AI Tool Register

| Tool ID | Tool Name | Version / Tenant | Approved Use Cases | Restrictions / Exclusions | Approval
Date
| Approved
By
| Review
Date
| Data
Class
| Notes |
|----------|-----------|------------------|--------------------|---------------------------|---------------|-------------|-------------|------------|-------|
| TOOL-
001
| | | | | | | | | |

Data Class: Public only / Internal / Customer-sensitive (with controls)

Worked Example: Cloud Identity to Backup Deletion

This example shows one complete chain. The customer and events are fictional. Each step links to the methodology section that governs it — readPart 1: Foundationsfor analytic standards andPart 2A: Phase-by-Phase Execution Guidefor phase activities, templates, and exit criteria.

Customer Story

Meridian Financial Servicesis a mid-size regional bank with 1,400 employees, operating a hybrid cloud environment. Most core banking workloads run on-premises, but the disaster recovery infrastructure — backup vaults, snapshot storage, and offsite replicas — migrated to a major cloud provider two years ago as part of a cost-reduction program. The cloud environment is managed by a small platform team of four engineers and accessed by roughly 40 service principals spanning payment processing, regulatory reporting, and backup automation.

In early 2026, the CISO read two public reports in the same week: one describing a ransomware group that had silently added a credential to a service principal weeks before triggering destructive cloud storage operations, and a second documenting a financial sector incident where backup vault deletions were only discovered after the retention window expired. Neither report named Meridian, but both described an attacker profile and cloud access pattern that matched Meridian’s environment closely enough to prompt an internal question:would we see this?

The CISO brought the question to the quarterly security investment review. The SOC lead confirmed that cloud identity changes were not currently correlated with backup or storage events, and that the relevant cloud audit logs were only retained for 14 days. The cloud security lead noted that no detection covered service-principal credential additions outside the change management window.

The team agreed to commission a 90-day CTI and detection engineering sprint. The goal was not a threat assessment — it was a decision: approve the cloud identity detection backlog and fix the retention gap, or deprioritize it in favor of other roadmap items. They needed intelligence to support that call.

The CTI lead used this template to run the engagement. Everything below is the output.

Step 1: PIR

Methodology:Part 1 → Intelligence Requirements·Part 1 → Strong PIR Format·Part 2A → Phase 1: Customer Decision and PIR Definition

PIR-01:
Decision supported:

prioritize

90
-day

detection

engineering

investment.
Question:

Which

cloud

identity

behaviors

could

lead

to

destructive

impact

against

production

or

backup

resources?
Consumer:

CISO,

SOC

lead,

cloud

security

lead.
Time horizon:

90

days.
Required confidence:

moderate.
Likely action if answered:

approve

cloud

identity

detection

backlog

and

telemetry

remediation.
Related crown jewels:

cloud

management

plane,

backup

vault,

production

storage.

Step 2: SIRs and Collection Tasks

Methodology:Part 1 → Strong SIR Format·Part 1 → SIR Quality Criteria·Part 2A → Phase 1: SIR activities

SIR-01.2 below is shown in full SIR template format as a reference row. SIR-01.1 and SIR-01.3 follow the same structure.

SIR-
01.2
:
Parent PIR: PIR-
01
Question:

Do
cloud audit logs capture service-principal credential additions
with
actor, source IP, resource ID,
and
timestamp?
Collection approach: Pull
10
sample events
from
the last
30
days covering credential additions, secret rotations,
and
federated trust updates.
If
no events exist
in
that window, generate a controlled test
event
.
Required evidence type: customer-observed cloud audit log sample.
Required data source: cloud audit logs.
Confidence threshold
to
close: high
for
field presence; moderate
for
retention adequacy.
Owner:
platform owner.
Due
date
: Day
15
.
Closure condition: sample
event
inspected
and
field mapping added
to
Customer Detection Data Model
with
actor, source_ip, resource_id, action,
and
timestamp confirmed parsed.
Status:
open.

All three SIRs in summary:

  • SIR-01.1— Question: Which privileged identities can delete recovery assets? — Collection Task: Export cloud IAM role assignments and backup administrator groups. — Owner: Cloud platform owner

  • SIR-01.2— Question: Are service-principal credential changes logged with required fields? — Collection Task: Pull sample audit events; confirm field presence in Customer Detection Data Model. — Owner: Platform owner

  • SIR-01.3— Question: Can destructive cloud actions be correlated to identity changes? — Collection Task: Test joins between cloud audit logs, IdP logs, PAM logs, and change tickets. — Owner: Detection engineer

Step 3: Source Claim and Evidence

Methodology:Part 1 → Source Reliability and Information Credibility·Part 1 → Evidence Labels·Part 2A → Phase 4: External CTI Source Intake and Validation

  • E-001— Claim: Destructive cloud operations may follow identity compromise or privileged credential abuse. — Evidence Label: Source-reported — Source: Public vendor and government reporting — Reliability: B — Credibility: 2 — Combined Rating:B2— Status: Accepted

  • E-002— Claim: Customer cloud audit logs include service-principal credential additions. — Evidence Label: Observed — Source: Customer sample logs — Reliability: A — Credibility: 1 — Combined Rating:A1— Status: Accepted

  • E-003— Claim: Backup vault deletion events are retained for only 14 days. — Evidence Label: Observed — Source: Customer cloud log retention review — Reliability: A — Credibility: 1 — Combined Rating:A1— Status: Accepted

Step 3.5: AI Use Log Entries

Methodology:Part 1 → AI Quality Tests·Part 1 → AI Governance Model· Part 2B → AI Workflow 1: Source Extraction · Part 2B → Task Card 7: Detection Logic Draft

Two example entries are shown below. Entry AIL-001 covers source extraction (AI Workflow 1 applied to the public vendor report that produced E-001). Entry AIL-002 covers detection logic drafting (Task Card 7 applied to the DET-001 design). Both entries show the Quality Checklist reference ID, the reviewer, and the validation status.

  • 2026–05–01— Workflow: AI Workflow 1: Source Extraction — Inputs: E-001 public vendor report (redacted customer identifiers; no personal data present — pre-screening checklist completed, all NO) — Output: Structured extraction table: claims, actor labels, ATT&CK candidate techniques, IOC list, dates — Model/tool: Approved private LLM tenant — Reviewer: CTI lead — Reviewed By: CTI lead — Quality Checklist: QC-AIL-001 — Validation: Three extracted claims verified against source text; one actor label removed (not present in source); dates confirmed; no fabrication found — Status: Accepted (revised: one actor label removed)

  • 2026–05–03— Workflow: Task Card 7: Detection Logic Draft — Inputs: DET-001 detection design, customer schema from Customer Detection Data Model Register, sample event SAMPLE-CLOUD-AUDIT-014, known false positives list — Output: Platform-neutral detection logic, KQL implementation draft, positive/negative/edge test cases — Model/tool: Approved private LLM tenant — Reviewer: Detection engineer — Reviewed By: Detection engineer — Quality Checklist: QC-AIL-002 — Validation: Query compiled in target platform; positive test passed; negative test passed; field names verified against SAMPLE-CLOUD-AUDIT-014; suppression logic reviewed for blast radius; no fabricated fields — Status: Accepted

Quality Checklist QC-AIL-001(abbreviated; stored as separate artifact):

  • **Source grounding:**Pass — all extracted claims map to source text

  • **No fabrication:**Pass (after revision) — one unsupported actor label removed

  • **Customer fit:**Pass — no customer-specific assets referenced in public source

  • **Uncertainty preserved:**Pass — source confidence language preserved

  • **Actionability:**Pass — output feeds E-001 in Evidence Register

  • **Security review:**Pass — no credentials, raw logs, or customer identifiers in output

  • **Prompt-injection resistance:**Pass — source text contained no embedded instructions

Quality Checklist QC-AIL-002(abbreviated; stored as separate artifact):

  • **Source grounding:**Pass — logic uses only fields from SAMPLE-CLOUD-AUDIT-014

  • **No fabrication:**Pass — no invented fields or values

  • **Customer fit:**Pass — query references customer schema field names

  • **Uncertainty preserved:**Pass — suppression logic documented as tuning input, not final

  • **Actionability:**Pass — output is the detection file submitted to version control

  • **Security review:**Pass — no credentials, session tokens, or restricted data

  • **Prompt-injection resistance:**Pass — sample event text contained no instructions

Step 4: Scenario

Methodology:Part 1 → Threat Scenario Priority Scoring·Part 1 → Confidence Language·Part 2A → Phase 5: Threat Scenario Development

Scenario ID:

SCN-01
Scenario name:

Cloud

identity

escalation

followed

by

backup

deletion
Decision ID:

DEC-01
Threat actor or actor class:

unknown

external

actor

or

compromised

administrator
Targeted crown jewels:

cloud

management

plane,

backup

vault,

production

storage
Potential impact:

recovery

inhibition

and

destructive

impact
Business impact score:

5
Likelihood score:

4

Likelihood evidence:

Sector relevance:

5



financial

sector

explicitly

named

in

both

public

reports

(E-001);

ransomware

groups

documented

targeting

cloud

DR

infrastructure

in

sector.

Customer exposure:

4



40

service

principals

with

backup

administrator

roles;

cloud

DR

environment

internet-accessible;

no

MFA

on

service-to-service

authentication.

Adversary activity:

4



public

reporting

documents

active

groups

using

service-principal

credential

abuse

as

pre-positioning

step

before

destructive

action

(E-001).

Exploitability:

3



backup

vault

accessible

to

any

service

principal

with

backup

administrator

role;

no

alert

on

out-of-window

credential

changes;

credential

addition

requires

no

additional

approval.

Control weakness:

5



no

identity-to-storage

correlation;

14
-day

log

retention

shorter

than

observed

attacker

dwell

time;

no

detection

at

any

DRL

for

this

path.

Likelihood derivation:

average

of

five

dimensions

(5+4+4+3+5)/5

=

4.2
,

rounded

to

4
.
Risk Score:

20
Defensive relevance score:

5
Detection feasibility score:

2

Feasibility evidence:

Platform

team

of

4

engineers;

no

existing

correlation

pipeline

between

identity

events

and

storage

events;

14
-day

retention

shorter

than

the

4
-hour

correlation

window

requires

a

retention

fix

before

detection

is

viable;

ticket

join

is

partial

at

62
%

coverage

(GAP-003).

Two

telemetry

sources

(IdP

logs

and

PAM

logs)

are

partial.

Engineering

effort

to

reach

DRL-9

from

DRL-0

is

high

relative

to

current

platform

capability.
Engineering Priority Score:

200
Priority label:

High

risk;

substantial

telemetry

investment

required

before

detection

reaches

production
Confidence:

moderate

Step 4.5: Gate B — First Attempt Fails

Methodology:Part 2B → Gate B: Scenario Approval

The scenario was submitted to Gate B immediately after Step 4. The CTI lead and customer security lead reviewed it together.

Gate B first-attempt outcome: BLOCKED

Blocking reason: SCN-01 has Risk Score 20 and Detection Feasibility 2 (below 3). Gate B mandatory blocker requires a documented telemetry remediation plan, control recommendation, or architecture decision before the scenario can pass. No such document existed at the time of submission.

Gate B evidence pack — first attempt:

Gate ID:

GATE-B-001-ATTEMPT-1
Gate name:

Gate

B



Scenario

Approval
Gate owner:

CTI

lead

(Meridian)

and

customer

security

lead

(Meridian)
Date:

2026-05-02
Related deliverables:

SCN-01
Required evidence:

Scenario

Register,

Evidence

IDs,

priority

score,

telemetry

score
Evidence IDs:

SCN-01,

E-001
Open blockers:

BLOCKER-B-1:

Risk

Score

20

with

Detection

Feasibility

2



no

telemetry

remediation

plan,

control

recommendation,

or

architecture

decision

documented.
Exception requested:

No
Gate status:

BLOCKED
Approver:


Notes:

Project

must

document

a

telemetry

remediation

plan

or

control

recommendation
before

Gate

B

can

be

re-attempted.

Recovery actions (completed between Gate B attempt 1 and attempt 2):

The CTI lead and platform owner convened a 90-minute working session. Three outputs were produced:

  • **Telemetry remediation plan (RAID-002):**Increase log retention from 14 days to 90 days for cloud audit, IdP, and backup platform logs. Owner: platform owner. Target date: 2026–06–15. Rationale: detection correlation window requires at minimum 4-hour tail-back; investigation and dwell-time analysis requires 90 days to match documented attacker patterns from E-001.

  • **Ticket join remediation (GAP-003):**Improve change-ticket join coverage from 62% to ≥80%. Owner: platform owner. Target date: 2026–07–01. Rationale: sub-80% ticket join creates false-positive risk for the out-of-window credential change rule.

  • **Interim control recommendation (DEC-01 update):**Until detection reaches DRL-7, implement an administrative alert on out-of-window privileged service-principal changes as a compensating control. Owner: customer security lead. Approval required from: executive sponsor. Status: pending approval.

These actions were entered in the RAID Register (RAID-002, RAID-003) and the Collection Gap Register (GAP-003). SCN-01 was updated to reference RAID-002 and GAP-003 in the Feasibility evidence block.

Gate B evidence pack — second attempt:

Gate ID:

GATE-B-001-ATTEMPT-2
Gate name:

Gate

B



Scenario

Approval
Gate owner:

CTI

lead

(Meridian)

and

customer

security

lead

(Meridian)
Date:

2026-05-04
Related deliverables:

SCN-01
Required evidence:

Scenario

Register,

Evidence

IDs,

priority

score,

telemetry

score,

telemetry

remediation

plan
Evidence IDs:

SCN-01,

E-001,

RAID-002,

RAID-003,

GAP-003
Open blockers:

None



BLOCKER-B-1

resolved

by

RAID-002

(retention

plan,

owner,

date)

and

interim

control

recommendation

(DEC-01

update).
Exception requested:

No
Gate status:

PASS



CONDITIONAL
Condition:

Retention

remediation

(RAID-002)

must

be

closed

by

2026-06-15
.

If

not

closed,

SCN-01

must

be

reviewed

and

Detection

Feasibility

score

updated.
Exception expiry:

2026-06-15
Risk owner:

Platform

owner
Approver:

Customer

security

lead
Notes:

Detection

engineering

may

proceed

to

DRL-1

on

the

basis

of

remediation

plan.

No

DRL-7

milestone

may

be

claimed

until

retention

is



90

days

and

ticket

join



80
%.

**Lesson from this Gate B example:**Gate B does not block detection work — it blocks claiming detection coverage without a viable plan. The project continued immediately to Step 5 with detection engineering running in parallel to telemetry remediation. Gate B failure is the correct outcome when a high-risk scenario has poor detectability and no documented path to closing the gap; the gate forces an explicit decision before the team spends engineering effort on a detection that cannot be validated.

Step 5: Observable and Telemetry

Methodology:Part 2A → Phase 3: Telemetry and Data Readiness Assessment· Part 2B → Task Card 4: Telemetry Feasibility Review

  • Service-principal credential added outside change window— Required Telemetry: Cloud audit logs, change tickets — Current Status: Available, ticket join partial

  • Backup vault deletion or retention reduction— Required Telemetry: Cloud audit logs, backup platform logs — Current Status: Available, retention too short

  • Same actor or source path across identity and destructive event— Required Telemetry: Cloud audit logs, IdP logs, PAM logs — Current Status: Partial

Step 6: Hunt Hypothesis

Methodology:Part 2A → Phase 6: Hypothesis-Driven Threat Hunting Backlog· Part 2B → Task Card 6: Hunt Hypothesis Generator · Part 2B → AI Workflow 4: Hunt Hypothesis Generation

HUNT
-01
:
If an actor
is
preparing destructive cloud activity through identity abuse,
then we may observe privileged service-principal credential changes outside approved change windows,
followed within
4
hours
by
backup deletion, retention reduction, snapshot deletion,
or
logging changes.

Result classification options:

Positive finding / Negative
with
good visibility / Negative
with
weak visibility / Inconclusive / Rejected hypothesis

Step 7: Detection Design

Methodology:Part 1 → ATT&CK and D3FEND Mapping Quality·Part 1 → Detection Readiness Levels·Part 2A → Phase 7: Detection Engineering Design· Part 2B → Task Card 7: Detection Logic Draft

DET-001:
Name:

Cloud

identity

escalation

followed

by

recovery-impacting

action
DRL:

DRL-1
ATT&CK:

T1078.004 Valid Accounts:

Cloud

Accounts



evidence:

E-002;

customer

service

principals

confirmed

capable

of

accessing

backup

vault;

controlled

test

(TEST-CLOUD-IAM-001)

used

this

technique.

T1098.001 Account Manipulation:

Additional

Cloud

Credentials



evidence:

E-001;

public

reporting

documents

this

technique

as

the

pre-positioning

step

in

financial

sector

incidents.

T1490

Inhibit

System

Recovery



evidence:

E-001,

E-003;

backup

vault

deletion

and

retention

reduction

directly

inhibit

recovery

capability;

retention

gap

(14

days)

confirmed

in

customer

environment.
D3FEND:

Administrative

Access

Authentication,

Credential

Rotation,

File

Backup,

User

Account

Permissions
Log sources:

cloud

audit

logs,

IdP

logs,

change

tickets,

backup

platform

logs
Required fields:

actor,

source_ip,

action,

resource_id,

timestamp,

change_ticket,

result
Correlation:

identity

escalation

followed

by

destructive

or

recovery-inhibiting

action

within

4

hours
Known false positives:

approved

automation,

emergency

maintenance,

break-glass

recovery

testing

Step 8: Test Plan

Methodology:Part 1 → DRL Transition Evidence Requirements·Part 2A → Phase 9: Test Data, Simulation, and Replay· Part 2B → AI Workflow 7: Test Case Generation

  • **Positive synthetic event: credential addition followed by backup deletion:**Alert fires

  • **Negative event: approved automation with valid ticket:**Alert suppressed or lower severity

  • **Edge event: missing change ticket field:**Alert fires with “ticket unknown” enrichment

  • **Historical preview: 30 days:**Alert volume and false-positive categories documented

Sample test evidence:

Detection ID:

DET-001
Test date:

2026-05-01
Tester:

detection

engineer
Data source:

cloud

audit

logs
Test type:

positive

synthetic

event

validated

against

real

sample

event
Input event or dataset:

TEST-CLOUD-IAM-001
Expected result:

alert

fires
Actual result:

alert

fired

with

actor,

source_ip,

resource_id,

action,

and

timestamp

populated
Pass/fail:

pass
Synthetic event used:

yes
Real sample event reference:

SAMPLE-CLOUD-AUDIT-014
Field names match customer schema:

yes
Values match expected platform encoding:

yes
Validated by:

platform

owner
Reviewer:

SOC

lead

DRL progression:

DRL-2: required fields confirmed in SAMPLE-CLOUD-AUDIT-014.
DRL-3: query compiled in target SIEM.
DRL-4: positive test passed with validated synthetic event.
DRL-5: negative and edge tests passed.
DRL-6: 30-day historical preview completed.

Step 9: SOC Action

Methodology:Part 2A → Phase 10: SOC Triage and Incident Workflow·Part 2A → Phase 11: Pilot Deployment and Tuning· Part 2B → Task Card 9: SOC Playbook Draft

First 15 minutes:
1.
Confirm actor, source IP, MFA state, and session path.
2.
Check change ticket and emergency maintenance records.
3.
Identify affected backup or production resources.
4.
Preserve cloud audit logs, IdP logs, and PAM session evidence.
5.
Escalate to IR if credential change is unauthorized or recovery assets were modified.

SOC dry-run record:

Playbook ID:

PB-DET-001
Dry-run date:

2026-05-03
Participants:

SOC

lead,

L2

analyst,

detection

engineer,

cloud

platform

owner
Scenario:

service-principal

credential

addition

followed

by

backup

retention

reduction
Result:

analyst

completed

first

15
-minute

triage

in

11

minutes
Missing fields:

none
Escalation path:

confirmed
Evidence preservation steps:

confirmed
Status:

approved
DRL update:

DRL-7

Pilot record:

Pilot duration:
5
business days
Alert volume:
4
alerts
True
positives:
0
malicious
Benign
true
positives:
1
approved emergency maintenance
False
positives:
3
approved automation events missing ticket enrichment
Precision estimate:
not
meaningful
for
this pilot. Zero malicious
true
positives occurred during the
5
-day window — this
is
expected
for
a detection targeting rare pre-positioning behavior
and
does
not
indicate a detection failure. Precision
is
undefined (
not
zero)
when
TP =
0
; reporting
0%
would misrepresent the detection
's health. Tuning is required before DRL-9 promotion to reduce the FP count from automation events.
Expected post-tuning FP rate: <
20%
; derivation: automation identity list expected
to
suppress all
3
automation FPs; emergency maintenance FP handled
by
approved maintenance window suppression;
0
residual FPs anticipated
in
steady state
for
both suppression rules combined.
Tuning decision: add approved automation identity list
and
require missing
or
invalid change ticket
for
high severity
Zero
true
-positive explanation: no malicious activity expected during pilot; detection value validated
by
controlled test TP (TEST-CLOUD-IAM-
001
)
and
benign
true
-positive classification.
Labeling completeness:
100%
(
4
/
4
alerts labeled
by
SOC lead
and
L2 analyst)
Low-frequency exception: invoked —
4
alerts falls below the
5
-alert minimum
for
DRL-
8
promotion. Exception approved
by
SOC lead
2026
-
05
-
08

on
the basis
of
: (
1
)
100%
labeling completeness; (
2
) all
4
alerts fully classified
with
documented benign rationale; (
3
) controlled test TP provides confirmed positive evidence independent
of
pilot volume; (
4
) scenario targets rare adversary pre-positioning behavior
not
expected
to
generate high baseline volume
in
a
5
-day window. Exception recorded
in
Gate E evidence pack.
Status:
pilot completed
with
tuning
DRL update: DRL-
8

**Note on labeling completeness in real engagements:**In this example, four alerts over five days made 100% labeling trivially achievable. For detections targeting rare adversary pre-positioning, 0% pilot precision is a measurement artifact, not a quality signal: when no malicious true positives occur during a short pilot window, the precision formula is undefined (TP = 0 makes the ratio 0/FP, not 0%), not a failure indicator. Do not flag the detection as precision-deficient on this basis alone; instead, record the FP categories, document the expected post-tuning FP rate, and confirm detection value through controlled positive tests. On engagements with higher alert volume, labeling completeness must be actively tracked from Day 1 of the pilot. If labeling completeness falls below 80% at the end of the pilot window, the team must choose one of three options: (1) extend the pilot by at least 5 business days and continue tracking labels, (2) relabel all unlabeled alerts retrospectively with direct SOC involvement before closing the pilot, or (3) document the gap as a known limitation, block the DRL-8 to DRL-9 transition until it is resolved, and record the decision and recovery plan in the Detection Health Register and Gate E evidence pack. Choosing option 3 without a dated resolution plan is not acceptable.

Step 10: Decision and Metric

Methodology:Part 1 → Claim-to-Action Chain·Part 2A → Phase 0: Success Metric Floors

Decision
DEC
-01
:
Approve
30
-
day
remediation
to
extend cloud audit retention
for
backup
-
related events
from

14
days
to

90
days
and
pilot DET
-001.
Metric:
DET
-001
reaches DRL
-9

within

60
days, cloud backup audit retention reaches
90
days,
and

all
future alerts include actor, source_ip, resource_id,
and
ticket context.

Step 11: DRL-9 Production Deployment and Gate E Evidence Pack

Methodology:Part 1 → Detection Readiness Levels·Part 2A → Phase 12: Production Deployment· Part 2B → Gate E: Production Approval

This step shows what “done” looks like at production readiness. All fields are required.

**Timeline note:**In this example, the detection moves from first test (2026–05–01) to DRL-9 (2026–05–15) in approximately 15 days. This is compressed for illustration. In a real engagement, the DRL-0 to DRL-9 path typically takes 6–12 weeks depending on telemetry readiness, SOC bandwidth, pilot alert volume, and approval SLAs. The example is intended to show the required artifacts and field completeness, not to set a timeline expectation.

Completed Production Readiness Checklist:

Detection logic validated:

yes



DET-001

v1.2

approved

by

detection

engineer

and

CTI

lead.
Positive tests passed:

yes



TEST-CLOUD-IAM-001

with

validated

synthetic

event

SAMPLE-CLOUD-AUDIT-014.
Negative tests passed:

yes



approved

automation

identity

list

and

valid

change

ticket

suppress

correctly.
Historical preview completed:

yes



30
-day

preview,

4

alerts

per

5
-day

window,

3

FP

categories

documented.
False positives documented:

yes



approved

automation,

emergency

maintenance,

break-glass

recovery

testing.
SOC playbook approved:

yes



PB-DET-001

approved

after

dry-run

2026-05-03
.
Severity approved:

yes



High

for

missing

ticket

+

destructive

action;

Medium

for

credential

change

only.
Owner assigned:

yes



detection

engineer

(primary),

SOC

lead

(operational).
Rollback plan defined:

yes



see

below.
Monitoring enabled:

-

Data source silence alert:

configured;

triggers

if

cloud

audit

logs

stop

ingesting

for

more

than

24

hours.

-

Zero-alert baseline alert:

configured;

triggers

if

DET-001

fires

zero

alerts

for

14

consecutive

days

without

approved

suppression.

-

Scheduled review date:

2026-08-01
,

assigned

to

detection

engineer.
Emergency disable procedure confirmed:

-

Disable owner:

SOC

lead,

authorized

by

customer

security

lead.

-

Disable steps tested:

yes
,

tested

2026-05-15
during

production

deployment

cycle.
Detection health entry created:

yes



see

below.
Review date assigned:

2026-08-01
.

Rollback plan stub:

Detection ID: DET
-001
Disable owner: SOC lead
Disable
procedure
:
Set
rule status
to
disabled
in
SIEM rule management console; confirm alert routing stops
within

15
minutes; notify detection engineer
and
customer security lead.
Expected customer impact: loss
of
detection coverage
for
cloud
identity
escalation
to
recovery
-
impacting action; compensating control
is
manual review
of
cloud audit logs weekly until rule
is
re
-
enabled.
Notification path: detection engineer
-
>
SOC lead
-
>
customer security lead
-
>
executive sponsor if impact exceeds
48
hours.
Re
-
enable criteria: root cause documented, logic corrected
or
suppression added, positive
and
negative tests passed, SOC lead approves.
Post
-
disable review requirement: detection engineer must
open
re
-
enable request
within

5
business days
with
root cause
and
fix plan.

DRL-9 Detection Health Register entry:

Detection ID:

DET-001
Status:

production
DRL:

DRL-9
Alert Volume:

4

alerts

per

5
-day

pilot

window;

0.8

alerts

per

business

day

expected

baseline
Labeling Completeness:

100
%

(4/4

pilot

alerts

labeled)
FP Rate:

75
%

during

pilot

before

tuning;

expected

<

20
%

after

automation

identity

list

applied
TP Count:

0

malicious

TP

during

pilot;

1

controlled

test

TP

from

TEST-CLOUD-IAM-001
Benign TP Count:

1

(approved

emergency

maintenance)
Last Fired:

2026-05-07
Last Tested:

2026-05-15
Last Reviewed:

2026-05-15
Data Source Health:

cloud

audit

logs

healthy;

backup

platform

logs

healthy;

ticket

join

partial



62
%

of

audit

events

matched

a

change

ticket

by

resource_id

in

30
-day

preview

(41/66

events

matched;

25

lacked

ticket

field

or

had

no

matching

ticket)



logged

as

GAP-003
Rule Errors:

none
Suppression Hit Rate:

3
/4

pilot

alerts

suppressed

or

down-severity

by

automation

identity

list

post-tuning
Last Disable Test Date:

2026-05-15
Next Disable Test Due:

2027-05-15
Owner:

detection

engineer
Action Required:

close

GAP-003

(ticket

join)

by

2026-07-01
;

re-assess

after

cloud

audit

retention

extends

to

90

days.

Gate E evidence pack summary for DET-001:

Gate ID:

GATE-E-DET-001
Gate name:

Production

Approval
Gate owner:

detection

engineer

and

SOC

lead
Date:

2026-05-15
Related deliverables:

DET-001,

PB-DET-001,

Production

Readiness

Checklist
Required evidence:

Test

Evidence

ID,

SOC

Playbook

ID,

Detection

Health

entry,

rollback

plan,

labeling

completeness

record
Evidence IDs:

E-002,

E-003
Test Evidence IDs:

TEST-CLOUD-IAM-001,

TEST-NEG-001,

TEST-EDGE-001
Decision IDs:

DEC-01
Open blockers:

none
Exception requested:

yes



low-frequency

pilot

exception

(SOC

lead

approval

2026-05-08
);

see

pilot

record.
Gate status:

Pass
Approver:

detection

engineer

and

SOC

lead
Notes:

ATT&CK

mappings:

all

three

techniques

(T1078.004,

T1098.001,

T1490)

confirmed

with

evidence

references;

no

candidate

mappings

counted

as

coverage.

GAP-003

(ticket

join

partial):

completeness

62
%

(41/66

events

in

30
-day

preview);

partial-join

events

receive

medium

severity;

full-join

events

receive

high

severity.

Gap

tracked

in

Detection

Health

Register

with

closure

target

2026-07-01
.

Low-frequency exception:

pilot

volume

(4

alerts)

below

5
-alert

minimum;

exception

approved

by

SOC

lead

on

documented

basis;

see

pilot

record

for

criteria.

Gate F note:

DET-001

is

eligible

for

Gate

F

review.

ATT&CK

mappings

are

confirmed,

not

candidates.

GAP-003

does

not

block

Gate

F

provided

closure

target

(2026-07-01)

is

met

and

completeness

reaches

≥80%

before

Gate

F

submission.

Final Customer Delivery Package

The final package should include:

  • executive summary;

  • key judgments with confidence;

  • evidence register;

  • decision register;

  • PIR/SIR register;

  • crown-jewel map;

  • attack surface and trust boundary map;

  • telemetry map;

  • customer detection data model;

  • CTI source register;

  • threat relevance matrix;

  • top threat scenarios;

  • hunt backlog;

  • detection backlog;

  • deployed detections;

  • detection health register;

  • detection coverage gap register;

  • detection test evidence;

  • purple-team test register;

  • SOC playbooks;

  • IOC review register;

  • contradiction register;

  • collection gaps;

  • RAID register;

  • customer acceptance record;

  • AI use log;

  • 30/60/90-day roadmap.

Minimum Viable Customer Delivery

A successful first-cycle delivery must be small enough to finish and strong enough to prove value.

Minimum viable delivery:

  • 3 approved PIRs;

  • 3 crown jewels mapped;

  • 1 attack surface and trust boundary map for the highest-priority environment;

  • 1 customer detection data model covering the first priority telemetry sources;

  • 5 validated CTI sources;

  • 3 customer-specific threat scenarios with priority scores;

  • 5 hunt hypotheses;

  • 3 detection designs;

  • 1 detection moved to pilot (minimum DRL-7, SOC playbook approved and dry-run completed before pilot starts);

  • 1 SOC playbook dry-run;

  • 1 executive decision note;

  • visible evidence, decision, contradiction, RAID, and telemetry gap registers.

If these cannot be completed in the first cycle, reduce scope before expanding analysis.

30/60/90-Day Execution Plan

The 30/60/90 plan must be dependency-aware. Complex customers may not reach production detection deployment in 90 days if telemetry, ownership, legal review, or SOC workflow maturity is not ready.

Milestone Dependency Table

  • PIR approval— Dependency: Executive and security stakeholder access — Risk if Missing: Work becomes analyst-driven instead of decision-driven — Fallback: Run a short PIR workshop and freeze scope.

  • Crown-jewel map— Dependency: Business and platform owner participation — Risk if Missing: Scenarios become generic — Fallback: Start with one business unit or critical service.

  • Telemetry assessment— Dependency: SIEM and platform access — Risk if Missing: Detections cannot be validated — Fallback: Produce telemetry gap plan and lab-only logic.

  • Detection pilot— Dependency: Parsed fields and SOC routing — Risk if Missing: Rule creates noise or no operational action — Fallback: Keep rule in lab and build playbook first.

  • Production deployment— Dependency: Tests, pilot, owner, monitoring, rollback — Risk if Missing: Unsupported production claim — Fallback: Report as pilot or backlog, not production.

The 30/60/90 plan is the operational implementation of the Master Workflow. Use the Master Workflow to define the sequence and the 30/60/90 plan to define timing, checkpoints, and fallback decisions.

Plan Selection Rules

  • **Telemetry, detection engineering, and SOC workflow are all Level 2 or higher:**Full Maturity 90-Day Plan may be attempted.

  • **Any of telemetry, detection engineering, or SOC workflow is below Level 2:**Minimum Viable 90-Day Plan is mandatory.

  • **AI governance is Level 0 and AI use is required:**Project cannot use AI until governance reaches Level 2 or AI is removed from scope.

  • **AI governance is Level 1 (informal) or Level 2 policy only, but no approved tool in the register:**AI workflows are disabled until at least one tool is approved and entered in the Approved AI Tool Register. An approved policy without an approved tool is not sufficient.

  • **Legal/privacy process is Level 0 and regulated or personal data is in scope:**Project remains Mode 1 until approval path exists. Mode 1 legal/privacy gate applies.

IR Pause/Resume Protocol

If the Active Compromise Escalation Protocol (Part 1 Rule 18) is triggered at any point during the 90-day plan, the following logic applies automatically:

On IR Pause trigger:

  • All analytical work on affected evidence, telemetry, or detection logic pauses immediately. “Affected” means any evidence, log source, scenario, or detection that references data from the environment under active investigation.

  • The current project day counter freezes. The elapsed-day count at the pause moment is recorded in the RAID Register (entry type: Issue).

  • All SLA clocks on affected deliverables pause. SLA timers for unaffected deliverables continue.

  • The IR lead provides written clearance criteria: the specific conditions that must be met before project work may resume (e.g., “IR containment confirmed,” “affected log sources re-verified clean,” “customer security lead sign-off”).

  • The Executive Sponsor and Customer Security Lead are notified within 24 hours.

On IR Resume:

  • IR lead provides written clearance confirming resume criteria are met. Clearance is recorded in the RAID Register with the clearance date and the elapsed pause duration.

  • The project day counter resumes from the frozen point. Days elapsed during the pause are not counted toward the 90-day window.

  • **SLA re-baselining:**All SLA clocks are reset from the resume date. The original SLA commitments remain; only the start clock shifts. Example: a Gate B target originally on Day 40 that was paused on Day 28 for 15 days resumes with a new target of Day 55 (original target + pause duration).

  • **Milestone recalculation:**All Day 20, Day 50, and Day 70 checkpoints are shifted by the pause duration. Record the updated checkpoint dates in the RAID Register alongside the original dates.

  • Any detection logic, scenarios, or evidence that relied on data from the affected environment must be reviewed for integrity before being used in AI workflows or gate submissions. Review is documented in the AI Use Log and RAID Register.

  • If the pause duration exceeds 30 days, the plan selection rules must be re-evaluated: evidence from before the pause may be stale and require re-validation before use in gate decisions.

IR Pause RAID Register entry fields:

RAID ID:
Type:

Issue
Description:

Active

Compromise

Escalation

Protocol

triggered



project

paused
Trigger date:
Affected

artifacts

(Evidence

IDs,

Detection

IDs,

Source

IDs):
IR lead:
Resume criteria:
Pause

duration

(days):
Resume date:
SLA re-baseline applied:

Y/N
Updated checkpoint dates:
Clearance reference:

Day 20 and Day 50 Checkpoints

Day 20 checkpoint:

  • confirm PIRs, crown jewels, mode selection, AI tool approval, and telemetry access;

  • de-escalate from Full Maturity to Minimum Viable plan if telemetry or SOC routing is not confirmed;

  • escalate from Mode 1 to Mode 2 only if searchable telemetry and collection owners are confirmed.

Day 50 checkpoint:

  • confirm detection designs, test data, SOC playbook path, and pilot feasibility;

  • de-escalate production goals to pilot-only if DRL-5 is not reached;

  • escalate to production goal only if DRL-7 is realistically reachable by Day 70.

Minimum Viable 90-Day Plan

This plan is realistic when customer access, telemetry, and approvals are constrained.

Days 1–30:

  • approve charter, AI rules, and data handling;

  • define 3–5 PIRs;

  • map 3 crown jewels;

  • validate 5–10 CTI sources;

  • build first evidence, decision, and gap registers.

Days 31–60:

  • complete telemetry assessment for priority sources;

  • create 3 threat scenarios with priority scores;

  • create 5 hunt hypotheses;

  • design 3 detections;

  • draft 1–3 SOC playbooks.

Days 61–90:

  • execute priority hunts where telemetry exists;

  • move 1 detection to pilot (DRL-7 required before pilot starts: SOC playbook approved and dry-run completed);

  • complete positive and negative tests for pilot detection;

  • deliver executive decision note;

  • deliver telemetry remediation roadmap.

Note on DRL-7 readiness: for Medium or High Complexity projects, reaching DRL-7 before pilot start requires SOC playbook design and a dry-run, which may not be achievable by Day 90 if SOC bandwidth is constrained. If DRL-6 is reached by Day 85, carrying the pilot preparation into a second cycle is acceptable. This must be declared in the executive decision note as a known delivery gap with a target date for DRL-7 and pilot start.

Full Maturity 90-Day Plan

Use this plan only when the customer already has strong telemetry, owners, SOC workflow, and deployment access.

First 30 Days

  • approve charter and AI rules;

  • define PIRs and SIRs;

  • map crown jewels;

  • assess telemetry readiness;

  • validate priority CTI sources;

  • create initial threat scenarios;

  • identify first collection gaps.

Days 31–60

  • run priority hunts;

  • design first detections;

  • build detection-as-code workflow;

  • create test cases;

  • run historical previews;

  • draft SOC playbooks;

  • pilot highest-value detections.

Days 61–90

  • tune pilot detections;

  • promote validated detections to production;

  • close highest-impact telemetry gaps;

  • deliver executive risk note;

  • measure coverage improvement;

  • reprioritize backlog;

  • set continuous improvement cadence.

References

Follow for practical cybersecurity research